Concrete Repair in LondonConcrete Repair in London

 

 

 

 

 

 

 

 

 

Calderwood Street MSCP

Client: Total Protection Group
Contract value: Approx. £1.5M

GC Construct Ltd was appointed by Total Protection Group to undertake an extensive programme of concrete repairs and protective coating works at Calderwood Street Multi-Storey Car Park in Woolwich, London. The £1.5 million project focuses on addressing deterioration to the reinforced concrete structure, improving durability and providing long-term protection against reinforcement corrosion.

The works involve concrete repairs to soffits, beams, columns and floor slabs, using specialist Sika repair systems. Corrosion protection measures include the installation of Vector Galvashield galvanic anodes and Margel corrosion protection systems, alongside the application of Sika FerroGard 903+. Protective anti-carbonation coatings are also being applied to specified concrete surfaces to enhance the long-term performance of the structure.

A key challenge of the project is delivering the refurbishment while the car park remains fully operational. Works are carefully phased across multiple levels, with designated working areas segregated to maintain safe vehicle and pedestrian access. Close coordination with Total Protection Group and car park management helps minimise disruption to users while maintaining a safe working environment throughout the programme.

Scope of works:

  • Concrete repairs to soffits, beams, columns and floor slabs
  • Preparation and treatment of exposed steel reinforcement
  • Installation of Vector Galvashield galvanic anodes
  • Installation of Margel corrosion protection systems
  • Application of Sika FerroGard 903+ corrosion inhibitor
  • Application of protective anti-carbonation coatings to specified surfaces
  • Phased working and access management within an operational car park

Key outcomes:

  • Extensive reinforced concrete repair programme across multiple levels
  • Enhanced corrosion protection using specialist repair systems
  • Improved long-term durability of the concrete structure
  • Continued car park operation throughout the refurbishment programme
  • Effective coordination and segregation of works to minimise public disruption